Program: This Old House | Type: Full Video | Aired: 2024-04-18
E20 | Glen Ridge Generational | QR Construction
The new two-story addition is framed, and the front porch is being rebuilt. Painting starts on the new wood windows. An interior wall is framed to straighten out a sag in the upper floor. Exterior colors are chosen, plumbing pipes are isolated from cold weather, and header-less window opening is framed. A foolproof method of laying out plumbing and electrical fixtures is shared.